Project Description
Client: Lykens Borough, PA
Year Completed: 2016
Engineer: Glace Associates, Inc
The borough of Lykens was having storm water overflow issues with the water reservoir dam. M2 rehabilitated the existing concrete at the exiting dam through demolition and pouring new concrete. The scope also included installation of an ACF environmental engineered block system to help direct overflow water and avoid washouts. M2 also installed rip rap along with creek with grout to keep it in place. The scope included minor piping removal and replacement as well as associated site work and grading. Special care was taken to work around the creek and reservoir.