Project Description

Client:  Granville Township Sewer and Water Department, Mifflin County, Pennsylvania
Year Completed:   2016
Engineer:  Glace Associates, Camp Hill, Pennsylvania

This project added a new building to the Granville Township Wastewater Treatment Plant as well as providing additional and upgraded equipment. M2 coordinated installation of owner purchased equipment with the construction schedule to make sure the project could be completed during the owners requested timeframe. The scope of work included a new concrete and metal building including an elevated concrete slab. M2 built the building and installed the metals while coordinating the mechanical installations with the owner and separate electrical prime contractor. Special care was taken for the finish on the slabs, both base and elevated, so that the finished product complimented the metal building finish.